PIRA Classification: 4B30.30
Description: Two tubes, one stainless steel the other copper, are held by students (or instructor) over bunsen burners. See which person drops their tube first.
Special Instructions: None
Condition: Ok
Setup time: 1 minute
Safety Issues: Don't hang on to the tubes for too long.