PIRA Classification: 4F30.20
Description: A model power plant containing a steam engine. An optional generator and lamp may be connected to the flywheel of the engine.
Special Instructions: Open both valves before plugging unit in. After about 5 minutes, the water should start to boil. When that occurs, close the valve on the boiler. Once steam leaves the exhaust, give the flywheel a kick start (counterclockwise).
Condition: Ok
Setup time: 2 minutes
Safety Issues: Boiler is hot.